April 14, 2017 aluminium industry news

2017-04-14

                          April 14, 2017 aluminium industry news

1, wine steel 900,000 tons of electrolytic aluminum project in Ka North Industrial Park, with the matching of the direct power supply system in the Gobi desert on the birth of the deserted. This is a great significance for the long-term development of the steel and the protection of aluminium industry. In order to implement low-cost strategy, the pursuit of scale benefit, liquor steel, Shandong Electric Power Engineering Consulting Co., Ltd., Guo Dian nan Rui Technology Co., Ltd., overcoming the impact of the direct power supply system security and stability operation, creative development of electrolytic Aluminum direct power supply technology, and to achieve the leading domestic level.

2, recently, reporters in the North Sea Economic Development Zone Aluminum Industrial Park see: Yu Energy Chemical Co., Ltd., Hanno Chemical surfactant project, Donggang Liu Lu North extension project, Su Hua metal aluminum processing projects, innovative carbon projects and other production and construction work orderly, the entire park construction framework, the construction of the scene in full swing.

3, April 7, Chinalco and Yunnan Metallurgical Group signed a strategic cooperation framework agreement with the headquarter of Chinalco. Vice party secretary of China Aluminium company deputy general manager, Chinalco party secretary, President Ao Hong, the group members of Chinalco, Vice general manager, China Aluminum shares committee Deputy Secretary, senior Vice President Lu Dongliang, Yunnan Metallurgical Groups Chairman, party secretary Tanaga, Yunnan Metallurgical Group general manager, Deputy secretary of CPC, Vice Chairman Sun Yong attended the signing ceremony. Ao Hong, Tanaga respectively, on behalf of the two sides in the Strategic cooperation Framework Agreement signed. The ceremony was presided over by Lu Dongliang.

4, Inner Mongolia Hua Yun New Materials Co., Ltd. 500,000 tons of aluminum alloy product structural adjustment and upgrading project, the project is located in aluminum package four, the total investment of 6.2 billion yuan, 2017 years plan to invest 2.2 billion yuan. Construction of 500,000 tons of aluminum alloy and 3 350,000-kilowatt units of the project. Electrolytic Workshop Construction is basically completed, the electrolytic cell installation is underway. The power plant is undergoing installation of unit equipment, and the three units are expected to be completed July, September and November respectively.

5, Henan Nonferrous Metals and Minerals Bureau in the recent annual work at the meeting revealed that the Bureau last year, the cumulative implementation of the mining project 124, "Silver mine plan" to promote the smooth, the new mineral exploration to achieve significant results in the industrial upgrading of Henan Province to provide a new "industrial food." Henan Nonferrous Metals and Minerals Bureau implement the "silver Mine plan" one year, in the Yao Mountain area of Shaanxi province East Fork-wide Ping, Temple Ditch-hu ditch mining area to achieve important stage results. In Xiongershan area, Luoning County-Lushi County, Cheng Jia Gou-sha Gou, the cumulative exploration of silver resources of 1120 tons.